Sportster/Buell Land Speed Build

Started by 55chevr, October 19, 2008, 04:19:13 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

55chevr



rear mount ... bolts to 4 mounting bolts on the frame and the 4 holes where the rear rubber mount went

55chevr



rear in place



front on the bench ...

55chevr



Frame rail modification to allow stock primary adjuster to fit through frame. 

Peter Jack

Joe, I don't know exactly where the access area you made in the frame is located, but if it's in an area that sees much stress I'd be tempted to weld a flange on the flat plate both on the inside and along the long straight edge.

Looking forward to seeing the finished piece!

Pete

55chevr



The engine is rigidly mounted and contributes to the structural integrity. I was going to make the loop continuous but the oil pan interferes. I added the cross brace when I did the first configuration build. By welding the tube and gusset in place before the piece was cut kept everything in alignment.

krek

Wouldn't a piece of tubing in that gap allow the space you need and be far stronger?

Peter Jack

Looks good Joe with the engine adding to the stability. Just keep an eye on it.

Unless the tubing was really heavy wall it wouldn't add as much strength as is there now unless it was gusseted as well. Why is it that no matter what you're attempting to do clearance always seems to get in the way?

Pete

krek


55chevr

I considered putting a piece of 2 inch heavy wall tubing in there vertically. the adjuster would pass through it. My son worked as a fabricator in a Charlotte Nascar shop back in the late nineties and he thought just the outside half donut was enough because the engine is rigidly mounted ... I added the gusset plate which he said is overkill but welded it up to make me happy. 

Peter Jack

I like your attitude. I sometimes get action for being overly careful when it comes to safety but I've seen the results up close when things aren't done properly. I'll continue to err on the side of safety.

The other thing to remember is that it's usually easier to do something right the first time than to cut it out and do it over once everything else is in place.

Keep thrashin' on her Joe! :-D :-D :-D

Pete

55chevr

Well brought the new bike out to Maxton for the last meet and there was strong head winds ... not likely I was going to advance my record with a 15 mph headwind so I wrenched on my nephew's bike ... It is fresh and ready for next year ...


saltwheels262

have you got a close up pic of the fuel tank on the bike
sitting on the left ?

what is the capacity?

bf
bub '07 - 140.293 a/pg   120" crate street mill  
bub '10 - 158.100  sweetooth gear
lta  7/11 -163.389  7/17/11; 3 run avg.-162.450
ohio -    - 185.076 w/#684      
lta 8/14  - 169.xxx. w/sw2           
'16 -- 0 runs ; 0 events

" it's not as easy as it looks. "
                            - franey  8/2007

55chevr


This is the tank mounts ... H-D oil tank grommets

I welded the mounts on the two diagonal braces that go from top rails to bottom rails

Tank holds 1-1/4 gallons ... each run on Bonneville short course used about 1/4 gallon.

saltwheels262

bub '07 - 140.293 a/pg   120" crate street mill  
bub '10 - 158.100  sweetooth gear
lta  7/11 -163.389  7/17/11; 3 run avg.-162.450
ohio -    - 185.076 w/#684      
lta 8/14  - 169.xxx. w/sw2           
'16 -- 0 runs ; 0 events

" it's not as easy as it looks. "
                            - franey  8/2007

55chevr


This is the bottom of the tank ... 4 bungs  5/16" ...

Photo of the frame mounts